Terra Green's Way to Make You Energy Independence
Solar is a construction project, not just an appliance. We handle the engineering, the government paperwork, and the safety checks. You just sign the papers.
Survey
Approval
Install
Net Meter
Subsidy
The 5-Step Engineered Journey
Step 1: The Scientific Audit
We Don't Guess. We Engineer.
Local installers just measure your roof area. We measure your "Solar Potential.
-
3D Shadow Analysis: We map sun patterns to identify obstructions like water tanks or trees that could kill generation.
-
Structure Health Check: We verify if your roof can hold the weight (25kg/sq meter) for 25 years.
-
Deliverable: A customized "Solar Feasibility Report."


Step 2: The Paperwork Shield
We Handle the Govt. Runaround.
Golden ACS promises "Assisting with approvals", but we manage the entire login.
-
Portal Registration: We create your account on the PM-Surya Ghar national portal and select your local DISCOM (MVVNL/PVVNL).
-
Sanctioned Load Check: If your meter load is too low for the solar system, we apply for the necessary load extension.
-
Deliverable: Technical Feasibility Report (TFR) Approval.
Step 3: The Professional Installation
Built to Survive Uttar Pradesh's Weather
We don't use standard iron that rusts. We use Cyclone-Proof structures.
-
Tier-1 Tech: Installation of MNRE-approved Bi-facial or Monocrystalline panels.
-
Safety First: We install Lightning Arrestors (LA) and Earthing Pits (Chemical Earthing) to protect your home from electrical surges.
-
Deliverable: A safe, commissioned solar plant.


Step 4: The Net-Metering
The Switch to Zero Bills.
This is where most delays happen. Our liaison team pushes the file through.
-
Joint Inspection (JIR): We coordinate the site visit with the local SDO/JE from the electricity board.
-
Meter Install: Replacing your old meter with a Bi-Directional Net Meter that counts both Import (Grid to Home) and Export (Solar to Grid).
-
Deliverable: Your system officially goes "Live."
Step 5: The Payday
Subsidy in Your Account.
We don't leave until you get paid.
-
Commissioning Certificate: We upload the final photos and JIR to the National Portal.
-
DBT Transfer: The government transfers the subsidy (up to ₹78,000) directly to your linked bank account.
-
Deliverable: Money in the bank and a Lifetime Warranty certificate.