top of page

Terra Green's Way to Make You Energy Independence

Solar is a construction project, not just an appliance. We handle the engineering, the government paperwork, and the safety checks. You just sign the papers.

Survey

Approval

Install

Net Meter

Subsidy

The 5-Step Engineered Journey

Step 1: The Scientific Audit

We Don't Guess. We Engineer.

Local installers just measure your roof area. We measure your "Solar Potential.

  • 3D Shadow Analysis: We map sun patterns to identify obstructions like water tanks or trees that could kill generation.

  • Structure Health Check: We verify if your roof can hold the weight (25kg/sq meter) for 25 years.

  • Deliverable: A customized "Solar Feasibility Report."

Tablet With Solar Panels
Writing On Papers

Step 2: The Paperwork Shield

We Handle the Govt. Runaround.

Golden ACS promises "Assisting with approvals", but we manage the entire login.

  • Portal Registration: We create your account on the PM-Surya Ghar national portal and select your local DISCOM (MVVNL/PVVNL).

  • Sanctioned Load Check: If your meter load is too low for the solar system, we apply for the necessary load extension.

  • Deliverable: Technical Feasibility Report (TFR) Approval.

Step 3: The Professional Installation

Built to Survive Uttar Pradesh's Weather

We don't use standard iron that rusts. We use Cyclone-Proof structures.

  • Tier-1 Tech: Installation of MNRE-approved Bi-facial or Monocrystalline panels.

  • Safety First: We install Lightning Arrestors (LA) and Earthing Pits (Chemical Earthing) to protect your home from electrical surges.

  • Deliverable: A safe, commissioned solar plant.

Solar Panel Installation
Image by Антон Дмитриев

Step 4: The Net-Metering

The Switch to Zero Bills.

This is where most delays happen. Our liaison team pushes the file through.

  • Joint Inspection (JIR): We coordinate the site visit with the local SDO/JE from the electricity board.

  • Meter Install: Replacing your old meter with a Bi-Directional Net Meter that counts both Import (Grid to Home) and Export (Solar to Grid).

  • Deliverable: Your system officially goes "Live."

Step 5: The Payday

Subsidy in Your Account.

We don't leave until you get paid.

  • Commissioning Certificate: We upload the final photos and JIR to the National Portal.

  • DBT Transfer: The government transfers the subsidy (up to ₹78,000) directly to your linked bank account.

  • Deliverable: Money in the bank and a Lifetime Warranty certificate.

Image by micheile henderson
What You Need To Provide
To reduce friction by telling them exactly what documents are needed upfront.
48.png
Identity Proof
49.png
Latest Electricity Bill
50.png
Banking Details

FAQ's

Frequently Asked Questions

bottom of page